 |
 |
 |
 |
 |
 |
|
Building the frames
|
|
Laminating the stem
|
|
Frames and longitudinal
structure already mounted.
The keel is being laminated
in place.
|
|
The hull ready to receive
the plywood covering.
A thick layer of fiberglass
will cover the plywood.
|
|
The interior must be completely
saturated with two coats of epoxy.
|
|
The bunks are placed
before the deck is closed.
|
|
The deck structure is ready
to receive the plywood.
|
|
A thick layer of fiberglass
will be applied over the plywood.
|